Download and verify

Document Library

Local copies are preserved here so the record does not depend on a third-party platform. Links to official city records are included when available.

Ordinance 2019-16 complete packet

Fifteen-page city packet containing the ordinance, legislative history, staff report, $677,650 contribution breakdown, and plan exhibits.

Download PDF

2019 Revised Preliminary Development Plan

The full plan image containing the entrance funding annotation and Exhibit 1 roundabout perspective.

Open full-size image

2018 Entrance Exhibit — Option 1

Gresham Smith drawing dated December 7, 2018, showing the roundabout at Drakes Creek, Avant, Anderson, and Countryside.

Open full-size image

2019 Entrance and streetscape sheet

Plan sheet with the conceptual entrance roundabout perspective and Avant Road park-lane improvements.

Open full-size image

January 14, 2025 BOMA minutes

City discussion tracing the off-site contribution restriction to Ordinance 2013-43 and the Final Development Plan.

Official city PDF

January 28, 2025 BOMA minutes

Clarification that the Durham Farms funds are restricted to off-site improvements rather than ordinary subdivision maintenance.

Official city PDF

November 2024 meeting packet

Discussion of the separate $650,000 appropriation and the history of the later city roundabout project.

Official city PDF

Gresham Smith project record

Identifies Freehold Communities/WFC Durham Holdings VII as client and Gresham Smith’s planning, engineering, and construction-drawing role.

Project page

Property aerial supplied by resident

Aerial view of 101 Countryside Drive with an annotated boundary reference.

Open full-size image

Missing foundational record

Ordinance 2013-43 and its stamped Final Development Plan have not yet been recovered. These are the highest-priority records because officials identified them as the source of the original off-site contribution restriction.